On August 6, a batch of metal roof beams were loaded into vehicles in the intelligent equipment manufacturing workshop of China Coal Group, and then sent to Hebei Province. At present, DFB (1400-4400
On the afternoon of July 31, a batch of single hydraulic props for mines were loaded in the intelligent equipment manufacturing workshop of China Coal Group and will be sent to a mine in Hebei Provinc
According to the "Administrative Measures for the Accreditation of "Specialized, Specialized and New" Small and Medium-sized Enterprises in Shandong Province" (Lu Gongxinfa [2020] No. 7), "About the o
On July 28, a batch of modified mining flatbed trucks were loaded in the third workshop of China Coal Group's intelligent equipment production and manufacturing, and will be sent to a mine in Luliang
July 27 was another busy day. A batch of mining flatbed trucks ordered by merchants in Guizhou and a batch of mining trucks ordered by merchants in Shanxi were loaded and shipped in the second and thi
On July 23, a batch of mining flatbed trucks were loaded in the third workshop of China Coal Group's intelligent equipment production and manufacturing, and then will be sent to a mine in Guizhou Prov
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen